Step | From/To | Submission document | |
---|---|---|---|
1 | Start | DAPA→AIMS PO | Platform charter: Complete and submit basic information for certification contract, including basic information about the platform, POC information, and test schedule |
2 | TPT request | DAPA→CFC→US DoD | Warranty letter and security measures (Korean/English) for each company participating in certification (overseas/domestic): To obtain approval for access to union cryptography equipment and AIMS certification documents |
3 | Dry-run | DAPA→US AIMS PO | Information needed prior to platform testing: A white paper that is required before performing platform certification and includes the purpose of use of Mode 5, required specifications, and overall platform description Dry-run report: 1202 test report equivalent to ground test |
4 | AIMS test | DAPA→US AIMS PO | Platform technical data: Brief description of the platform White paper: Technical description of the platform (software information) 1202/1203 test report 1203 log data set |
5 | AIMS certification | DAPA→US AIMS PO | Discrepancy letter responses (D/L): Action or explanation for D/L issued by AIMS PO regarding the results of this test |